Skip to content
Primary marketNew

Rumiankowe Zacisze

ul. Rumiankowa, Stara Wieś, Warsaw area

Rumiankowe Zacisze (MK Construction), Stara Wieś: 13 available houses (of 32 in the development), prices from 790 000 zł, average price per m²: 7 288 zł.

Apartments in this development

For sale: 26 of 32, of which reserved: 13 · Prices as of 04 Oct 2026

Showing 26 of 26

Unit no.StatusPDF sheet

Monthly payment — estimate: 20% down payment, 30 years, interest rate 6,15%.

About the development

In short

  • Prices from 790 000 zł (from 6 641 zł/m²)
  • 13 available houses: 119 m², 5 rooms
  • Developer: MK Construction
  • Amenities: gas heating, air-conditioning pre-installation, alarm system

Rumiankowe Zacisze is a development of 32 terraced houses being built by MK Construction in Stara Wieś (Nadarzyn municipality), south-west of Warsaw. To the north it borders the Las Młochowski forest, and the S8 expressway junction is approx. 4 km from the houses — about 20 minutes' drive to southern Warsaw. The houses have approx. 119–141 m² of usable floor area, an integral garage and a private garden; plots range from approx. 163 m² for mid-terrace houses to approx. 350 m² for end-of-terrace houses.

Each house has a ground floor with a living room open to the kitchen and access to the garden, and an upper floor with three or four rooms. Above it is an insulated non-habitable attic (approx. 40–50 m², four roof windows, utilities in place) that can be fitted out, e.g. as a laundry room, walk-in wardrobe or home office; the attic is not included in the usable floor area.

Standard features: gas heating, air-conditioning pre-installation, alarm system and fibre-optic internet. There are no monthly service charges on the estate, and each house comes with two parking spaces — in the heated garage and in front of the house.

Construction started in September 2025 and is proceeding in phases: according to the developer's construction log from June 2026, buildings 1 and 2 are in the final finishing stage, buildings 3 and 4 are having installations and finishing works done, and the remaining buildings are at the shell stage. Nearby are shops, a pharmacy, parcel lockers, nurseries and schools in Stara Wieś, Łazy and Nadarzyn; Janki shopping centre and IKEA are approx. 16 km away.

Amenities:gas heating, air-conditioning pre-installation, alarm system, fibre-optic internet, attic ready for conversion (approx. 40–50 m²), no monthly service charges
Included:garden, integral garage, parking space in front of the house
Project size:32 terraced houses in 8 buildings
Garages:heated integral garage (approx. 17–19 m²) and a second parking space in front of the house
Plots:from approx. 163 m² (mid-terrace) to approx. 350 m² (end-of-terrace)
Construction progress:construction started IX 2025; per the construction log of 9.06.2026: buildings 1–2 — final finishing works, 3–4 — installations and finishing, 5–7 — shell stage
Transport:S8 junction approx. 4 km, approx. 20 min to southern Warsaw; quick access to Chopin Airport
Nearby:Las Młochowski forest (walking and cycling trails), primary schools in Łazy and Nadarzyn, secondary school in Nadarzyn, Lidl in Nadarzyn, pharmacy, petrol station, parcel locker, Janki shopping centre and IKEA approx. 16 km

Amenities

  • Terraces

Development details

Property type
houses
Street
Rumiankowa
City
Stara Wieś
Municipality
Nadarzyn
Voivodeship (province)
Masovian

How to buy with TM Invest

  1. Step 1: Choosing

    We compare developments from our catalogue against your budget, location and move-in date. We help you check the developer and the information prospectus (prospekt informacyjny).

    How to check a developer 
  2. Step 2: Reservation

    We talk to the developer about the price and terms of purchase. Before you sign, we review the reservation agreement (umowa rezerwacyjna).

    Reservation agreement with a developer 
  3. Step 3: Developer agreement

    Before the notary appointment, we go through the developer agreement (umowa deweloperska) and the payment schedule. If you buy with a mortgage, our expert compares bank offers.

    Developer agreement – what to watch out for 
  4. Step 4: Handover

    Once construction is finished, you inspect the apartment and report any defects (odbiór), then sign the transfer of ownership agreement (umowa przeniesienia własności).

    Handover inspection with the developer 

In most cases the buyer pays us no commission – our fee is usually paid by the developer. The whole process step by step

Location

ul. Rumiankowa, Stara Wieś, Warsaw area

Warsaw city centre — 28 km · approx. 70 min by car

What’s nearby

  • Stara Wieś NastrojowaBus240 mapprox. 4 min on foot
  • Stara Wieś PoziomkowaBus650 mapprox. 11 min on foot
  • Stara Wieś BrwinowskaBus670 mapprox. 11 min on foot
  • Stara Wieś PieczarkowaBus870 mapprox. 14 min on foot

Straight-line distance; walking time is approximate. Data: © OpenStreetMap.